Operation Procedure

1. Disconnect the load and pulse the unit at approximately 60hz for approximately 5 seconds until the dc voltage across the capacitor reads 40-50 volts.

2. Connect the load.

3. Pulse the device at approx. 60 hz for approx. 5 seconds every 30+ minutes. There is no need to disconnect the load during this re-charge. Motor rpm will drop noticeably during this time then immediately return to normal.

4. Be advised that a vom across the charge cap will slightly increase the time required to reach the desired voltage at pulse.

5. Voltage indicated across the cap was kept in the 20-50v range, although a dissipation to under 20v, but above supply, may work as well or more efficiently.

Going Green Energy

Going Green Energy

What Is The First Essential Step For Going Green With Energy? Get Everything You Need To Know To Get Started With Helping The Earth And Conserving Energy. This Book Is One Of The Most Valuable Resources In The World When It Comes To Learning About Energy Sources That Will Help Save The Planet.

Get My Free Ebook


Post a comment