System Cost Parameters

This section summarises the estimates of the system component costs and the costs of operation and required maintenance. [This cost data came from a variety of sources, including data from previous projoctc and manufacturor'e literature. A complete definition of each parameter is provided in the Biomass Energy Conversion Technology section in 3.3.]

Amount

Capital Costs in Thousands oT $ Canadian

Feedstock Preparation/Handling 408 $

Mobile Equipment 54 $

Energy Conversion Equipment

Building/Structure

Pollution Control

Site Preparation

Land

Equipment Installation Total Direct Costs Indirect Capital Costs

TOTAL INITIAL INVESTMENT (!p)

CONSTRUCTION PERIOD (P)

Capital Cost Schedule During Construction (for P years) Year 1-P Year 2-P Year 3-P

Year 0 (Plant on line)

EQUIPMENT REPLACEMENTS (RJ None Specified

SALVAGE VALUE (Sn)

ANNUAL OPERATION & MAINTENANCE COSTS

Maintenance

Labour

Chemicals & Other Raw Materials

6083

Included $

7315

1195

years

ICI AL OPLHAI ION & MAIN I tNANCt (OM)

* NA = Not Applicable or Not Available

Note: A set of symbols (e.g., n, P, L,, E1t E2, C, I Rmi, Sn, OM) is shown here for key inputs into the sector analysis models.

The analyst has used the Building/Industrial Sector Economic Analysis Model explained in Section 4.2 to calculate the Net Present Value of the project. The analysis is conducted in current dollars and considers the effects of income tax and depreciation. A Net Present Value greater than zero would indicate to the analyst that the project is financially attractive. In this section, the system analyst has specified the economic and financial data inputs required and present the results of the analysis.

0 0